August 14, 2003

The work went well tonight and since there was some detail work most of the work doesn't show in the picture above. I finished the sheathing in the finish room area and also on the south edge. The finish room areas included drilling holes for the conduit and the water and drain line. I wanted a nice close fit on these since the sink holes will show. I also added supports around the trap doors for the sump hole and the dust control pipe area.