July 15, 2003

I took Monday night off on the project to get some things done at work, but tonight I went right to work on the perimeter anchor bolts and the rebar installation. As you can see I got it all cut and laid in place and will tie it together tomorrow night. You may remember that I let the rebar extend through the form to tie the two pieces of concrete together. You can see in the image below that I bent several of the rebar pieces at a 90 degree angle to provide further anchoring. The 3/4" PVC conduit is stubbed up for the phone line entry into the building. I also plan a coax cable run from the house for TV at some point in time.