July 16, 2003

The word for tonight was SULTRY! The humidity was as high as the 87 degree temperature and not a breath of air. So the mosquitos had fun attacking me as I dug the footing you see above and forming it up. This is the office area and defines the corner of the garage portion of the shop. The digging was tough with the limestone and gravel base that covers the entire area. But I was able to get low enough to form the corner and refill with river rock. The red arrow shows where the stub of the footing was poured last weekend. I will drill into this footing and install rebar to keep the two pieces from shifting.