July 28, 2003

After a long weekend away from the project it was good to get back to work. After picking up material at the lumber yard I dug a trench to install a 1-1/2 inch PVC conduit to act as a channel for the 1/2" copper LP line that I will install after the cement is poured. I also installed a 1" PVC conduit for the communication lines to be installed later. I stubbed this conduit into a utility pull box that you see in the front of the picture. I will extend this conduit to the north side of the shop and enter into the water line area for later hook-up. Following the installation of the conduit I filled the forms with rock.