March 19, 2005

I was a little late in getting started this morning, the first project was a couple hours of snow removal. We had a late winter snowstorm dump about 6 inches of wet heavy snow on us and it piled up in drifts nearly 2 feet high. I wanted to bring in a load of material so needed to clear the drive all the way down to the shop. When I did get to work Sandy helped me hang the shelves that I finished painting the other night. The I emptied all the boxes you see above and arranged the material on the shelves as well as the hobby bench.

I worked most of the day on sorting out the material and although most of what is on the shelves will be moved to the shop when I have cabinets built out there this does nelp make room in the shop to move around.