May 20, 2003

The primary project today was to get 30 tons of road gravel delivered and spread over the new drivway leading to the shop. The projct itself is a mixture of 1" rock and finer material that packs tight with traffic. It took two truck loads of gravel and about 3 hours of grading to complete the drive. I also worked on the water entrance to the shop by grading the floor area and digging a sump hole. I set a couple 16" clay tile over a gravel bed in preperation for installation of a sump pump at a later date.