May 15, 2004

It was a cold night with the temperatures dropping to below freezine, so instead of getting right to work on the shed I worked in the shop office getting a couple coats of paint on the ceiling and crown molding. I then moved to the shed that had warmed up in the sun and finished the sheetrock on the back wall. As you can see below I also finished the end walls with the scrap from the back wall.

These two small projects gave the outdoor temperatures enough time to increase to over 50 degrees so I went to work on the exterior stain. Sandy helped me with the first coat and after lunch I put a second coat on whiel Sandy worked on lawn mowing. The stain iks finished but I still have some trim to paint around the door.