September 29, 2003

Tonight's project wasn't very showy, in fact you need to be inside the shop to see it at all. I pulled down some salvaged rain gutters that came off the house project, which had been stored in the machine shed. I connected them togeter to reach the 28 foot length needed for the roof section over the garage. The toughest part of the project was getting the 4 or 5 years worth of dust off of them so I could get them caulked and screwed together. I had to hook up my work light so I could see to get the paint applied to it. The next picture has nothing to do with the shop project, except that it is the view out the west door of the shop, what a wonderful view.