August 21, 2003

The work today doesn't show as much as other projects. I had contacted the LP people to get the new tank set-up for the shop and the house LP tank moved back in place. The work was pretty simple but did take some time. I was able to get most of the foundation plywood on the east side of the shop in between working with the LP installers. The line is all run to the shop and the installers cut the copper pipe to length and flared the fitting to attach to the regulator that I have stored in the shop until I get things ready for it. They also put a hundred gallons of LP in the 500 gallon tank so that I will have some when I get the furnace installed. I don't expect to do much heating this winter but want it there to be sure.