August 29, 2004

Today was another day that started out with installing gussets to the cedar band, and I finished the project none too soon. As I mentioned before the work was boring. I took a break from the stoop work long enough to finish the crawl hole to the attic space. The picture above shows the hole from above with the side pieces installed. These are a foot high so that the insulation will not fall through the hole. From below I cased it with salvage casing from the house project.

I went back to work on the shop next. I insulated the south wall since that is where I had last worked on the gussets and had everything moved away from it. Then I hung the full sheets on the south wall and left to top for another day. I also picked up the black pipe for the furnace gasline from Fleet Farm today so I can get that line installed next.