February 15, 2004

The first project this morning was installation of the cove molding in the finish room. I had planned to do it on Saturday but held off to make sure the joint cement was dry. It took about an hour to install the trim and caulk it in. The ceiling is now ready for paint and then I will be able to install the permanent fixtures.

My next project was to complete the framing on the shop wall. This required locating the entrance door and moving the temporary step that I had been using (think a couple pallets). Then it was time for more snow removal. I had to widen the drive and make an area to turn around with a vehicle. I will be taking delivery on more sheet rock on Monday and hate to think about getting stuck in the hard snow. When I finished the snow I wired a light above the table saw and another outlet, this one on the shop side of the wall.