July 5, 2005

The plan for tonight was to start the caulking in preperation for staining the storage building. But when I started thinking about it I decided to do some wiring instead. We are both getting tired of the long heavy cord pulled from the shop to the building site. So I mounter the panel and got an inside and outside outlets installed. The panel is a small two-circuit 70 amp panel that I used as part of my temporary service on the new shop. I don't need the rain tight cover on it but will leave it there since I have it and it works just fine. I will have two circuits, one for lighting and the other for the two outlets.